Whistler Conference Centre

Taxonomia

Código

Nota(s) de âmbito

Nota(s) da fonte

Mostrar nota(s)

Termos hierárquicos

Whistler Conference Centre

Termos equivalentes

Whistler Conference Centre

Termos associados

Whistler Conference Centre

147 descrição arquivística results for Whistler Conference Centre

147 resultados diretamente relacionados Excluir termos específicos

Slides

  • GRI-01-33-051
  • Dossiê/Processo
  • 1974-2007
  • Parte de Greg Griffith

Photographs of early Whistler Village with some under construction (buildings include: Delta Mountain Inn/Hilton Whistler Resort, Carleton Lodge, Whistler Conference Centre, Crystal Lodge, Hearthstone Lodge, Rainbow Building, Blackcomb Lodge, Fitzsimmons Lodge, Clocktower Building, Executive Inn & Suites, Mountainside Lodge, St. Andrews House, Myrtle Philip Elementary School, a group of buildings labelled as 'Whiskey-Jack'), views of an unknown bird in the snow, a snowman dressed up in a 'Ski Blackcomb' baseball cap, a crowd of people watching a ski race, a shirtless man skiing [possibly Frank Papenburg - as labelled by John Lee], view of many skis sitting in racks, someone windsurfing with ski boots on, view of docks on Alta Lake, portraits of a man on a ski hill, a landscape of a snowy creek, a radio mascot skiing a race, and someone helping install a mat on a chairlift tower.

Captions:
010: "Whiskey-Jack"
019: "C-FOX MASCOT (RADIO STATION)"

Week of October 4, 1982

Photographs including but not limited to Whistler Village; tractor; exercises; Brownies; children's activities; mountain views; Whistler Conference Centre; awards; building a boat; The Downhill Shop; Valley Inns; signs; medical clinic; Niels Petersen Band
Appears in October 7, 1982 issue:
02-301-27. Pg. 1. Caption: Whistler's Brownies rekindled the campfire spirit Oct. 4 when they gathered at Myrtle Philip School for the first meeting of the year.
02-301-121. Pg. 2. Caption: Parking problems -- is there light at the end of the tunnel?
02-301-126. Pg. 2. Caption: See caption above.
02-301-129. Pg. 2. Caption: See caption above.
02-301-6. Pg. 3. Caption: [top] Municipal crews levelled out the roller-coaster surface of the former construction campsite to ready it for winter parking. Administrator Geoff Pearce reported that the work was done at minimal cost. A decision has not yet been made as to whether the site will be used for free parking, pay parking or employee parking.
02-301-10. Pg. 3. Caption: [bottom] The winning team (minus one key player -- Mick Maloney), who put together Whistler's weekly miracle, the Question, which was judged top in its class by B.C. and Yukon Community Newspapers Association Oct. 2.
02-301-72. Pg. 5. Caption: T'is the season to get sawing and chopping. These Alpine residents seem well prepared for winter's onslaught.
02-301-93. Pg. 6. Caption: [top left] Terry Rodgers, Alderman, White Gold Estates.
02-301-31. Pg. 6. Caption: [top middle] Don Biggar, Consulting Engineer, Alpine Meadows.
02-301-91. Pg. 6. Caption: [top right] June Paley, WMSC Hostess, Whistler Cay (MDC)
02-301-112. Pg. 6. Caption: [bottom left] Parts of the old ventilation system from Peter's Underground, which were removed by workmen Oct. 3.
02-301-109. Pg. 6. Caption: [bottom right] Staff member at Peter's Underground shows the newly installed pizza oven, which is part of the renovations Peter Skoros plans for the winter season.
02-301-117. Pg. 8. Caption: Members of the Niels Petersen Band. Niels Petersen (lead vocals), Connie Lebeau (base guitar), Christopher Allen (Harp) and Gary Petersen (drums) warm up an act that will be entertaining Whistlerites all winter. The band will be appearing at Tapley's and at the Brass Rail throughout the ski season.
02-301-78. Pg. 9. Caption: A crew of landlubbers helped hoist the deck onto the sleek craft which Cress Walker and Paul Clark have been building all summer long in the driveway of their Alpine Meadows home.
02-301-21. Pg. 10. Caption: Dryland downhill training -- Dave Murray takes Blackcomb and Whistler Ski club members through some of the exercises that helps limber up skiers for the season opening.
02-301-105. Pg. 12. Caption: [bottom] Dennis and Judy Waddingham display the new sign painted by Charlie Doyle, which hangs outside their store in Whistler village. Opening day will be before the mountains begin their season.
02-301-102. Pg. 16. Caption: Mac Pac Ad left Adventures West
02-301-98. Pg. 16. Caption: Mac Pac Ad Right Whistler Vale

Week of October 4, 1984

Photographs including but not limited to totem pole carving; houses; Ladies Golf Tournament winners
Appears in October 4, 1984 issue:
02-414-A-1. Pg. 12. Caption: Keith Sabey sent his 24 ft. totem pole down to its home in West Vancouver last week. Sabey has been working on the totem pole -- his sixth or seventh he says -- for the past three months in front of his home in Emerald Estates. It was made out of Western Cedar, the traditional wood for making totem poles among native people. At top is a thunderbird, followed by an owl, bear (with a salmon in its paws still to be added), hum and whale. Sabey says he doesn't painstakingly plan where he will place each figure -- he just "whittles away."

5702 Alta Lake Road

Two handwritten notes, one form filled out by Florence and Andy Petersen, and an additional sheet of paper with handwritten anecdotes about 5702 Alta Lake Road, Lot 14. The handwritten notes list the owners of the property over the years, the form lists the price for which it was sold and who it was bought from. The additional sheet gives a much more detailed narrative of Andy and Florence Petersen's life in Whistler.

Envelope 3

Photos and negatives depicting a wide variety of places and events from the Whistler area including, Crystal Lodge, Keg Lodge, the Conference Centre, Wedge Mountain, volleyball, and construction.

Prints 013-016

Two photographs of the conference centre's roof being cleared of snow and two of the construction of Crystal Lodge.

Prints 049-052

Photographs of construction in Whistler Village, including the Whistler Conference Centre, Carleton Lodge under construction with the Clocktower Hotel in the background, the Clocktower Hotel with some construction in front of it, and the Hilton Hotel under construction.

Prints 057-060

Photographs of roof construction on the Whistler Conference Centre, and a crowd of people in Village Square with Amsterdam Pub and the construction of the Hilton Hotel in the background.

Resultados 1 a 10 de 147