Showing 133 results

archival descriptions
Creekside File
Print preview View:

2 results with digital objects Show results with digital objects

Negatives

Photographs of a powder day on Whistler Mountain, with views of [Red Chair?], and crowds of people near the Gondola Barn at Creekside.

Note: contact sheets correspond to the negatives in this file, and also include photographs from the next file, GRI_010_43_009.

Negatives

Aerial photographs of Whistler Creek Lodge in Creekside, and summer view of its swimming pool.

Negatives Sheet 1

  1. A swollen Whistler Creek during a flood.
  2. Flooding in Creekside by a sign pointing the way to the Gondola.
  3. Construction equipment in a flooded area in Creekside.
  4. Construction equipment in a flooded area in Creekside with the Gondola Barn in the background.
  5. Construction equipment in a flooded area in Creekside with the Gondola Barn in the background.
  6. Construction equipment in a flooded area in Creekside.
  7. Construction equipment in a flooded area in Creekside with the Gondola Barn in the background.
  8. Flooding beside Highway 99.
  9. Flooding beside a residential road.
  10. Flooding in field surrounded by trees.
  11. Flooding beside a residential road.
  12. Flooding on the Whistler Golf Course.
  13. Flooding in a wooded area.
  14. Flooding a wooded area with houses in the background.
  15. A flooded creek coming through a wooden barrier.
  16. A flooded creek.
  17. A flooded creek in a wooded area.
    18-20. 3 photos of an unidentified young girl playing on a floor.
  18. A person walking beside a flooded Whistler Creek.
  19. Some children sitting beside a flooded Whistler Creek.
  20. A bridge over a flooded Whistler Creek.
  21. Some houses near the site of some flooding.

Negatives Sheet 2

  1. Farmers Market stalls on the Village Stroll.
  2. Tables set up in Mountain Square with Amsterdam Pub in the background.
  3. Tables set up in Mountain Square with Amsterdam Pub and the Hilton Hotel construction in the background.
  4. A crowd in Mountain Square.
  5. A crowd in Mountain Square watching a performance with the Amsterdam Pub and Hilton Hotel construction in the background.
  6. A crowd in Mountain Square with the Amsterdam Pub and Hilton Hotel construction in the background.
  7. Whistler Conference Center's Roof under construction.
  8. Unidentified building under construction.
  9. Hilton Hotel under construction.
  10. A crowd in Mountain Square with Amsterdam Pub and the Hilton Hotel construction in the background.
  11. A crowd in Mountain Square with Amsterdam Pub in the background.
  12. The Clocktower building.
  13. The Hilton Hotel under construction
  14. The Clocktower building with construction in the foreground,
  15. Whistler Village Inn and Suites under construction.
    15-17. The Hilton Hotel under construction.
  16. The Adara Hotel under construction with the Whistler Conference Centre in the background.
  17. Flooding in the Creekside area.
  18. Cars parked by the Whistler Conference Centre.
  19. The Hilton Hotel under construction.
  20. Carleton Lodge under construction with the Clocktower Building in the background.
  21. Flooding in the Creekside area.
  22. Flooding in the Creekside area with the Gondola Barn in the background.

Nov 81

Slide film of the Gondola Barn in Creekside, marijuana growing, a flood at Creekside with old culverts washed out, and Whistler Village.

Oct 81 V5

Slide film of Whistler Mountain, Creekside in summer, Whistler Village, an aerial photograph, Creekside parking lot, and a Search and Rescue Labrador helicopter.

Park Signage and White Water Photographs

  • MACLAURIN_2017_011-012-002
  • File
  • 1990 - 2010
  • Part of Don MacLaurin

File includes photographs of signage for different parks and trails, including bear awareness signs; photographs of dam construction on Whistler Creek; photographs of water rapids; Photographs were found in an envelope labelled "Don's photos of movie (White Water) plus Signs for Parks".

Patrol 80 Glide Crack

Photographs of digging in the snow, the Creekside parking lot, Whistler T.V. tower on Sproatt, Whistler TV Society (3/2//84/42), Ski Patrol cabin, the interior of Roundhouse, Blue Chair, and Lower and Upper Insanity run.

Pemberton Secondary School Assignments

Assignments completed by Sara Jennings during her education at Whistler Secondary School between 1990 and 1994.

Includes:

  • "Changing Times", a journal entry for [Grade 11 or 12] English class on how Whistler was changing at the time, including the positive and negative effects of the development of the town.
  • A Social Studies assignment where the student had to clip an article from the newspaper and write about their perspective on it. The article chosen is "Transit shelter agreement" from the Whistler Question. Sara writes about her support for an newer, more extensive public transit system in Whistler.

Photographs of Resort Development - 1979-1998

  • WA_2018_031-01-001
  • File
  • 1979-1998
  • Part of Sabre Group

Photographs of Whistler Village development taken by Sabre Excavation Corp. between 1979 and 1998. Photographs include Garry Davies, Art den Duyf, and Hugh Smythe making a trip up Blackcomb Mountain to determine where the ski runs should go in 1979, Sabre Excavation completing the excavation of Village Square in Whistler Village in Spring 1979, Sabre completing snow-clearing in 1980, Sabre working on road construction near the Whistler Golf Course in 1980, Sabre Excavation working on the excavation of the site for the construction of the Westin Hotel in 1998, and Sabre excavating in the Creekside Village area.

Captions:
001: "Going up Blackcomb to determine where the ski runs should go - April [19]79 - L[eft] to R[ight :] ?, Garry Davies, Art den Duyf + Hugh Smythe"
002: "Sabre (Art den Duyf Pres) did the excavation of Whistler Village in Spring 1979 where the Drugstore, Grocery Store + Liquor stores were built."
003: "1980 - Sabre used to do all the snowclearing of the Village and subdivisions in Whistler before the RMOW took over."
004: "1980 - Sabre road construction - Whistler Golf Course - Opened in 1981 + redesigned by Arnold Palmer into 18 holes - opened in 1983."
005: "The Westin - Sabre did the excavation for the Westin Hotel (Cressey Dev. Corp.) - 1998"
006: "Sabre - Creekside Development - year?"

Results 41 to 50 of 133