Affichage de 548 résultats

description archivistique
Dossier Construction
Aperçu avant impression Affichage :

1 résultats avec objets numériques Afficher les résultats avec des objets numériques

Park Signage and White Water Photographs

  • MACLAURIN_2017_011-012-002
  • Dossier
  • 1990 - 2010
  • Fait partie de Don MacLaurin

File includes photographs of signage for different parks and trails, including bear awareness signs; photographs of dam construction on Whistler Creek; photographs of water rapids; Photographs were found in an envelope labelled "Don's photos of movie (White Water) plus Signs for Parks".

Slides

  • GRI-01-55-002
  • Dossier
  • [c. 1978-1999]
  • Fait partie de Greg Griffith

Photographs of an event on the mountain with skiers and tables of food, a photographer taking photos of a ski racer at a start line on Whistler Mountain, skiers on a three-person chairlift as seen from underneath, people canoeing on Alta Lake, a group of skiers climbing up a mountain, Arnold Palmer speaking with someone on Whistler Golf Course, a ski racer on a race course for the Molson World Cup Downhill, the Springs grill and waterslide at night, Whistler Village at night in winter near Fitzsimmons and Blackcomb Lodges, people riding a three-person chairlift in summer, hang gliding equipment in a field with Clocktower Building and Delta Mountain Inn in the background, a wood-chopping and log-climbing competition [Squamish Days Logger Sports Festival?], early construction of Whistler Village, an aerial of early Whistler Village with Blackcomb Mountain in the background, and people playing hockey on a frozen lake.

Negatives

  • GRI-01-39-002
  • Dossier
  • [c. 1978-1980]
  • Fait partie de Greg Griffith

Photographs of a group of people in the mountains [hiking?] and the construction of Whistler Village including construction crews, Hearthstone Lodge, and Rainbow Building.

Adventures West Village - Development Summary and Plan - October 15, 1971

Legal-size sheet titled "Adventures West Village" that shares the development summary and plan for operating the condominiums planned for the East side of Alta Lake [only Stage 1 was completed].

Contents:

  • Staged Development Program
  • Price and Estimated Operating Costs of Condominium Units
  • Purchase Procedure / Easy Terms
  • Furnishing Package
  • Rental Income Program

Roadbuilding Photographs

  • MACLAURIN_2017_011-012-021-002
  • Dossier
  • 1975 - 1995
  • Fait partie de Don MacLaurin

File includes photographs of road construction (what appears to be a logging road); photographs of a MacLaurin family celebration; photographs of a speaking presentation; photographs of signage in the Whistler Interpretive Forest; photographs of scenery in the Whistler Interpretive Forest area.

Negatives

  • GRI-01-40-002
  • Dossier
  • [c. 1974-1985]
  • Fait partie de Greg Griffith

Photographs of a helicopter installing chairlift towers, views of Whistler Village, and construction of Whistler Village (buildings include: Clocktower Building, Fitzsimmons Lodge, and Hearthstone Lodge).

Construction Photographs - Envelope 2

Photographs of the construction of Millennium Place.

001: Exterior view of Millennium Place under construction, dated 1/10/00.
002: Person on scaffolding inside building, dated 14/8/00.
003: A crane with several trailers and a pick-up truck in an outdoor area.
004: A crane beside a trailer labelled "Amako (?) Construction Ltd."
005: A grove of coniferous trees in the Whistler Town Plaza.
006: A bulldozer/backhoe in an outdoor area with buildings in the background.
007-008: Millennium Place in an early stage of construction, with wooden scaffolding in a deep pit. Dated 3/6/00.
009: Construction workers on wooden scaffolding in pit. Dated 3/6/00.
010: A woman at a computer inside a building. Dated 6/6/00.
011: View from inside the excavated pit, looking upwards, with neighbouring building visible. Dated 6/6/00.
012: View from inside the excavated pit, showing concrete walls. Dated 6/6/00.
013: View between two concrete walls in the excavated pit. Dated 6/6/00.
014: Inside the excavated pit, with neighbouring buildings visible at the top. Dated 6/6/00.
015: View of the artificial stream, with mountains in the distance.
016: Wooden scaffolding in excavated pit.
017: View of excavated pit, with workers at work and neighbouring building visible.
018: Two backhoes in excavated pit.
019-020: Backhoe in excavated pit, with neighbouring buildings visible.
021: Crane lifting a trailer near artificial stream.
022: Person climbing ladder through hole in ceiling inside building. Dated 14/8/00.
023: Ground floor of Millennium Place under construction, with neighbouring building visible.
024-026: Bird's-eye view of roof [?] of Millennium Place under construction.
027: View of excavated pit with workers laying out wooden planks.
028: Crane lifting trailer near artificial stream.
029: View of Millennium Place with wall under construction and entrance to underground parking lot in foreground. Dated 24/8/00.
030: Gap between entrance to underground parking lot and wall of Millennium Place.
031: Close-up of construction.
032: View of stone pillars of [Westin Hotel?].
033: Ground floor of Millennium Place under construction, with neighbouring building visible.
034: Bird's-eye view of Millennium Place under construction, with cars driving by on road.
035: Millennium Place under construction, with entrance to underground parking lot in foreground. Dated 1/10/00.
036: Ground floor of Millennium Place under construction, with Black Tusk crane. Dated 1/10/00.

Résultats 31 à 40 sur 548