Affichage de 185 résultats

description archivistique
Whistler Question Construction
Aperçu avant impression Affichage :

Week of August [13], 1978

Photographs including but not limited to bears in dumpsters; Construction; GPE; Christiana Inn

Week of August 4, 1978

Photographs including but not limited to Creekside Construction; Volleyball; river; car
02-042-10. Pg. 4 of August 2, 1978 issue. Caption: Mud, water, and more mud threaten to engulf this worker at the bottom of the new sewer line. Casano Construction ran into difficulty last week when an old creek hidden underground was unleashed.
02-042-18. Appears in August 2, 1978 issue on pg. 5. Caption: Pictures taken last week of the unsightly mess left by the receding waters of Alpha Lake (Left) and
02-042-07. Appears in August 2, 1978 issue on pg. 5. Caption: the north end of Alta Lake (right).
02-042-15; 02-042-05. Appears in August 2, 1978 issue on pg. 6. Caption: The heavy equipment preparing the site for the Whistler Vale Condominium site. Approval for this 36-unit development was given on Monday night, July 31.
02-042-04. Appears in August 2, 1978 issue on pg. 8. Caption: Stella and Murray Coates' party over the weekend produced a fine turnout of locals in the balmy weather.

Week of August [?], 1978

Photographs including but not limited to baking cookies; Construction; driving; Black Tusk

Week of July 21, 1978

Photographs including but not limited to Eldon Beck; North American Whitewater Championship Kayaking; Construction
02-044-05. Pg. 3. Caption: The finished product -- a distinctive Zurbrugg chalet.
02-044-48. Pg. 3. Caption: Frieze and shutter dectoration.
02-044-07. Pg. 3. Caption: Worker constructs doweled wall on Chalet site.
02-044-25. Pg.6. Caption: Werner Furrer (third place K1) explodes over wave, heading for gate 28.
02-044-28. Pg. 7. Caption: The last gate is in sight for this K1 competitor as he battles the foam.
02-044-46. Pg. 9. Caption: Asphalt oil heater is lifted off lowbed at Malloch & Mosley on Friday July 14, as Doug Muir looks on.
02-044-50. Pg. 10. Caption: Artist's conception of the new Highland Lodge after expansion work starting soon.
02-44-13. Pg. 11. Caption: First the chasm over the river.
02-44-02. Pg. 11. Caption: ... then the stringers.

Week of July 5, 1978

Photographs including but not limited to Canoeing Alta Lake; Tennis; outdoor buffet; Construction; driving; rivers; covered bridge
02-045-14. pg. 6. Caption: Beating out a rhythm on the drum, a participant from one of the parade floats gives a hoot in Pemberton.
02-045-7. pg. 6-7. Caption: Spectators crowd the street as the Pemberton parade crawls to Signal Hill school.
02-045-15. pg. 7. Caption: Sherri Bilenduke smiles during Pemberton parade on July 1st.
02-045-20-21. Pg.8. Caption: The outside and some of the debris from the inside of the Mount Whistler Lodge. Situated near Alta Vista, the lodge commands a beautiful location on Alta Lake.
02-045-27. Pg. 9. Caption: The B.C. Rail bridge over the Fitzsimmons Creek showing how the gravel buildup has drastically reduced the space between the water & the bridge.
02-045-19. Pg. 10. Caption: Workers sweat under the sun at the scene of the new Hydro substation expansion project. Some locals are involved. See story at right.
02-045-30. Pg. 11. Caption: Future Olympic champions and Freestyle money winners ham it up at the bottom of the lifts on Monday. Toni Sailer Ski camps are in full swing again this year.

Week of June 28 [2], 1978

Photographs including but not limited to waterfall; cars; dancing; Construction
02-047-4. Pg. 1. Caption: Power lines dip treacherously after Sunday's strong winds knocked large piece of deadwood onto the line.
02-047-7. Pg. 4. Caption: Sarah, Wendy and Sid try to decide what to do with that nosy photographer during party Friday.
02-047-18. Pg. 5. Caption: Brenda Dunbar shows her appreciation at a recent party given in her honor.
02-047-10. Pg. 7. Caption: New BBQ ready to be installed at Alta Lake Wayside Park.
02-047-13. Pg. 9. Caption: Someone was practicing their glass breaking at the liquor store last week. RCMP are investigating.
02-047-11. Pg. 9. Caption: "Dig we must" boys at Casano project near Christiana turn-off. Sewer lines are now going in.
02-047-15. Pg. 11. Caption: Man in wetsuit un-earths another manhole, see notes from all over.

Week of March 2, 1980

Photographs including but not limited to skihill construction; Little Nell's; snow removal; school; dogs; hotel interiors; dining; skiing; Whistler Creek Lodge; Ski Rainbow; Filling Station; construction; John Robinson
Appears in March 13, 1980 issue
02-055-31. Pg. [12] or back cover. Caption: Developer Peter Gregory and Architect Archambault show plans for the 316 room Mountain Inn.
March 6, 1980 issue
02-055-67-68. Pg. 1. Caption: New sign at the Village -- the new identifying sign at the entrance to the new Whistler Town Centre.
02-055-49. Pg. 3. Caption: An enraptured audience -- Myrtle Philip School students enjoy the Raincoast Puppet Theatre.
02-055-52. Pg. 3. Caption: Norm Foote watches while Andrea Desroches and Fraser Marshall perform.
02-055-82. Pg. 4. Caption: Rainbow Ski Village scenes. The inside of Beau's.
02-055-89. Pg. 4. Caption: Doug Schull at work in his Racer's Edge ski shop.
02-055-99. Pg. 5. Caption: Rainbow Ski Village. Showing the gentle slopes of this beginner ski area.
02-055-102. Pg. 5. Caption: Hang in there! A determined youngster rides up one of the Rainbow handle tows.
02-055-4. Pg. 6. Caption: Not a Corral! This new fenced area outside L'Apres is just the extention of the patio area in readiness for the spring season.
02-055-139. Pg. 8. Caption: The newly completed Whistler Creek Lodve.
02-055-116. Pg. 9. Caption: Carved snow lions guard the hotel entrance.
02-055-77. Pg. 9. Caption: Inside one of the deluxe suites showing the bedroom and kitchen.
02-055-111. Pg. 9. Caption: The lobby and front desk area.
02-055-39. Pg. 12. Caption: Snow for sale! Not really - just the highways clearing of the hydrants on Lake Placid Road.
02-055-10. Pg. 13. Caption: Daylodge takes shape: The new Backcomb day lodge rises up out of the ground at the day skier parking area.
02-055-45. Pg. 13. Caption: Oops! Warm wet weather caused the snow to slide of this Telemark roof and flatten the wagon parked below.
Appears in February 28, 1980 issue.
02-055-131. Pg. 6. Caption: Notice the use of wood in the restaurant -- from the heavy fir tables to the logs on the feature wall behind.
02-055-136. Pg. 7. Caption: The Filling Station Bar is made from a large slab of cedar with smaller bar-level areas behind.

Week of February 26, 1980

Photographs including but not limited to construction; chairlift line-ups; lodges; dumpsters; drinking
02-056-6. Pg. 1. Caption: University school break results in record mid-wee crowds.
02-056-5. Pg. 1. Caption: This is not a Sunday! Just the Olive Chair lineup on Thursday, February 21.
02-056-24. Pg. 5. Caption: Lennie Thevarge and Mark Dan look over artifacts at the Heritage Village in Burnaby.
02-056-23. Pg. 5. Caption: Grade 10 students on their x-country trip at C.M.O.S. Stephen Vogler, Garth Phare, Laura Sabey, Pam Spencer, Aleta Ross, Angela Frederick, Judy Tourand, Mr. Georgas.
02-056-15. Pg. 7. Caption: This pile of garbage which was dumped by the side of the highway at Nesters Rd. on Monday morning had the following note in it: Dear Matt, Peter or Dawn, the fridge is f...d so I put the food outside Signed: Gust. If you know any of these people please let us know.
02-056-4. Pg. 9. Caption: MDC President Charlie McClain addresses the shareholders while Francois Lepine and Ken Beatty look on.
02-056-2. Pg. [10] or back cover. Caption: Mild weather allows work to proceed on the town centre. Concrete is poured on the floor slabs of Parcel 6 while roofers work on Parcel 10 in background.

Week of November 28, 1979

Photographs including but not limited to construction; Rotary club meeting; car accidents; sale; signs
02-069-17, 20. Pg. 1. Caption: Improvements at the Whistler Lift Base -- the retaining cribbing at the base of the Olive chair (above); and (below), the new paved gathering area outside the ticket windows.
02-069-26. Pg. 4. Caption: Mr. Bob Ainsworth, the new general manager of Garibaldi Lifts Ltd., Whistler operation.
02-069-14. Pg. 5. Caption: The new first aid room in the old garage building at the lift base.
02-069-55. Pg. 6. Caption: One of the many new international symbol signs at Garibaldi Lifts.
02-069-50. Pg 10. Caption: A study in concentration - Trev Roote carves out house number signs at the Fall Fair.
02-069-33. Pg. 11. Caption: Rick Foster and Marie Dumansky (left) of R&M Jewelry at the gold sale they put on at the Highland Lodge on November 22.
02-069-41. Pg. 12. Caption: The Toyota belonging to Glen McInnes that went over the new curbing into the Wayside Park parking lot.
02-069-39. Pg. 15. Caption: One of Whistler Disposal's new front-loading garbage compactor trucks at work at the Mons site.
02-069-1,3,6,9,11. Pg. [16] or back cover. Caption: Smiling faces at the Community Club Fall Fair: from left to right- Bob Walsh smiles as he hold his $100.00 jumper cables; auctioneer Don Willoughby; Claude Hoodspith; Jodi & Brad Rustad check their gift certificate; a happy Sue Cameron as she won the season's pass; auctioneer Dave Cathers.

Résultats 21 à 30 sur 185