- WA_2016_013-01-002-001
- Item
- August 1964
Part of Gord Leidal Fonds
The Alpha Lake section of Highway 99 construction in August, 1964.
Part of Gord Leidal Fonds
The Alpha Lake section of Highway 99 construction in August, 1964.
Blast South of Daisy L[ake] Channel
Part of Gord Leidal Fonds
Blast during the construction of Highway 99 South of Daisy Lake.
Daisy L[ake] Channel After Blast - rock & sand on track
Part of Gord Leidal Fonds
Rock and sand on the railway track after a blast near Daisy Lake Channel during the construction of Highway 99 in June, 1964.
Slides taken by Gord Leidal showing the original 1964 construction of Highway 99 from Squamish to Pemberton and the landscape around Whistler at that time.
Part of Gord Leidal Fonds
Photographs of the 1964 construction of Highway 99.
Part of Gord Leidal Fonds
Photographs of the construction of Highway 99 in 1964 and surrounding views.
Part of Gord Leidal Fonds
Slides taken by Gord Leidal showing the original 1964 construction of Highway 99 from Squamish to Pemberton and the landscape around Whistler at that time.
Prior to Blast at Daisy L[ake] Channel - Covering PGE tracks with sand
Part of Gord Leidal Fonds
Covering the Pacific Great Eastern Railway tracks with sand prior to a blast near Daisy Lake Channel during the construction of Highway 99 in June, 1964.
Rutherford C[ree]k Bridge over
Part of Gord Leidal Fonds
A man standing on a bridge over Rutherford Creek, the site of the construction camp for those working on Highway 99 in October, 1964.
Rutherford C[ree]k Constr[uctio]n Camp
Part of Gord Leidal Fonds
Construction camp for those working on Highway 99 at Rutherford Creek in 1964.