- WA_2016_013-01-001-002
- Stuk
- June 1964
Part of Gord Leidal Fonds
A truck on a tote road on the way to Pemberton during the construction of Highway 99 in June, 1964.
Part of Gord Leidal Fonds
A truck on a tote road on the way to Pemberton during the construction of Highway 99 in June, 1964.
Prior to Blast at Daisy L[ake] Channel - Covering PGE tracks with sand
Part of Gord Leidal Fonds
Covering the Pacific Great Eastern Railway tracks with sand prior to a blast near Daisy Lake Channel during the construction of Highway 99 in June, 1964.
Green Lake & Whistler M[oun]t[ain]
Part of Gord Leidal Fonds
Logs floating on Green Lake with Whistler Mountain in the background, taken during the construction of Highway 99 in July, 1964.
Part of Gord Leidal Fonds
Green Lake during the construction of Highway 99 in July, 1964.
Whistler M[oun]t[ain] - Callaghan Area
Part of Gord Leidal Fonds
Truck driving in the Callaghan area with Whistler Mountain in the background during the construction of Highway 99 in May, 1964.
Alpha Lake from Whistler M[oun]t[ain] [2]
Part of Gord Leidal Fonds
View of Alpha Lake from Whistler Mountain in August, 1964.
Part of Gord Leidal Fonds
Cars and a house with Mount Currie in the background in Pemberton, 1964.
M[oun]t[ain]s North of Squamish from Cheakamus Canyon
Part of Gord Leidal Fonds
The mountains North of Squamish as seen from the Cheakamus Canyon in October, 1964.
Part of Gord Leidal Fonds
A truck crossing small wooden planks over a washout during the construction of Highway 99 in June, 1964.
Green River Diversion - Squamish to Pemb[erton]
Part of Gord Leidal Fonds
Green River diversion between Squamish and Pemberton during the construction of Highway 99 in June, 1964.