Photographs including but not limited to town planning; Blackcomb Construction; cars;
May 29, 1980
02-113-44. Pg. 1. Caption: [top] Construction camp trailers shape up in Town Centre as workers (background) excavate sewer line trenches.
02-113-15. Pg. 1. Caption: [bottom] Jim Carlberg, architect-developer, spotlight's his presentation to Council with model of Package 18 while Chris Green, No. 17 developer, looks on.
02-113-39. Pg. 5. Caption: Singing Pass parking lot, about three miles from the highway through Town Centre, with new map and visitor register.
02-113-28. Pg. 6. Caption: [above] Cast and Crew of Gold Key Entertainment's movie "Up River" waif for the next take.
02-113-24. Pg. 6. Caption: [below] a Cabin is ignited for a dramatic scene ready to shoot.
02-113-18. Pg. 7. Caption: Jim Bradley assisted by Peter Grant and his truck prepares to move this building off a duplex lot near Whistler Centre.
02-113-66. Pg 8. Caption: Hydro use giant trailer and steering unit to move new transformer into Rainbow substation at Mons.
02-113-5. Pg. 11. Caption: Package 16 is quick to start work. The first of the Phase II parcels to start work in the Town Centre this year. Jim Cook's pumper truck helps fill forms with cement from Cardinal Concrete.
02-113-72, 43. Pg. 14. Caption: Here today, gone tomorrow -- the continuing battle of graffiti artists on the old firehall at Mons was finally ended Tuesday May 27 when municipal crews tore the building down.
02-113-16. Pg. [16]. Caption: The uphill, sunny east side of the new Blackcomb daylodge waits for glass and interior work to be done.